The job, start to finish

We photograph our work the honest way: before, during, and after. Here is a recent master bath rebuild, stage by stage. More projects are being added as we pull photos from 37 years of jobs.

Project 001 · Master bath rebuild

Cracked unit to cultured marble

The old fiberglass shower had split at the seat and was leaking into the subfloor. We tore it out, repaired the drain and floor, set a cultured marble surround with safety seating, and hung a frameless glass slider.

Before: Aging framed shower, ready to fail
01 · Before

Aging framed shower, ready to fail

Tear-out: Cracked fiberglass unit removed, drain exposed
02 · Tear-out

Cracked fiberglass unit removed, drain exposed

Prep: Walls patched, sealed, and trued up
03 · Prep

Walls patched, sealed, and trued up

Surround set: Cultured marble walls, seat, and grab bar in
04 · Surround set

Cultured marble walls, seat, and grab bar in

After: Frameless glass slider, done and cleaned
05 · After

Frameless glass slider, done and cleaned